(262) 966-3741 [email protected]
  • View Other IMS Sites
    • AMCO Enclosures
    • Electrol
    • IMS Companies
    • IMS Engineered Products
PowerWhips
  • Home
  • Products
    • Data Center Under Floor
      • IEC
      • NEMA
      • Russellstoll
    • Data Center Overhead
      • Tray Cable
      • SOOW Cords
    • Field Whips
    • Prefab Electrical Assemblies
  • About
    • Powerwhips Brochure
    • IMS Corporate Brochure
  • Contact
  • Resources
    • How SOOW Cords Improve Data Center Performance
    • How To Prepare for Power Whip Cable Installation
  • Configurator
  • Blog
Select Page
Short Guide on How IEC 60309 Power Cords Are Made

Short Guide on How IEC 60309 Power Cords Are Made

by denysesalvador | Jul 31, 2024 | Uncategorized

IEC 60309 power cords are essential components in various electrical systems. Data centers rely on these power cables for handling high currents and voltages, making them indispensable. Use this short guide on how IEC 60309 power cords are made to understand their...
Why Are Straight Blade NEMA Receptacle Used in Data Centers?

Why Are Straight Blade NEMA Receptacle Used in Data Centers?

by denysesalvador | Jul 8, 2024 | Uncategorized

Ensuring reliable and safe electrical infrastructure in data centers is paramount. The straight blade NEMA receptacle is crucial to achieving this goal, yet it often goes overlooked. However, their presence is questionable when numerous other power sources are...
Data Center Under Floor vs. Overhead Cords: Which Is Better?

Data Center Under Floor vs. Overhead Cords: Which Is Better?

by denysesalvador | Jun 20, 2024 | Uncategorized

The layout and management of cabling play a crucial role in data center efficiency and maintenance. Two predominant approaches for cable management are under floor and overhead configurations, each with distinct advantages and limitations. Discover which is better...
5 Ways the Government Benefits From Data Centers

5 Ways the Government Benefits From Data Centers

by denysesalvador | Jun 14, 2024 | Uncategorized

The majority of sensitive government information is stored as data, making data centers indispensable in modern governance. By centralizing and managing vast amounts of data, these facilities enable the efficiency of various governmental departments. Here are some...
Different Types of Russellstoll Pin and Sleeve Connectors

Different Types of Russellstoll Pin and Sleeve Connectors

by denysesalvador | May 2, 2024 | Uncategorized

Russellstoll is a staple brand in the realm of electrical connections. The pin and sleeve connectors have adorned industrial spaces for decades, providing strong connections critical to power applications. Discover the different types of Russsellstoll pin and sleeve...
A Quick Overview of How IEC 60309 Cords Are Made

A Quick Overview of How IEC 60309 Cords Are Made

by denysesalvador | Apr 18, 2024 | Uncategorized

Various standards govern how we use and build equipment for electrical systems in industrial environments. The IEC 60309 standard outlines requirements for industrial sockets, plugs, and connectors, and understanding the intricacies of this standard is crucial for...
Page 5 of 21« First«...34567...»Last »

Categories

  • Test
  • Uncategorized
© 2023 PowerWhips an IMS Engineered Products Brand | Sales Terms and Conditions | Contact | Advantages of Pre-Fabricated Data Center Power Cables/Whips